High-voltage transformer bushings

Bushings built in hours, not cured for days.

Mantle makes transformer bushings with a dry, fused-film condenser core. No oil, no vacuum impregnation, no long cure. Shorter lead times for the transformers the grid is waiting on.

Starting at 69 kV. Deck available on request.
fused polymer film aluminum grading foils conductor no impregnation, no cure
Each foil layer is a capacitor in series. Stepping the foil lengths spreads the voltage evenly from conductor to flange.

The problem

The grid is waiting on transformers, and transformers wait on bushings.

Utilities and data centers now wait years for large power transformers. Bushings are one of the long-lead parts, and they are behind roughly 18% of transformer failures. Today's dry bushings use a paper or fabric core that has to be vacuum impregnated with resin and cured for days in large ovens. That process is slow, capital heavy, and concentrated in a few factories. Mantle removes the impregnation and cure entirely.

How it works

Three steps, one machine line.

  1. 01

    Wind

    Polymer film is wound onto the conductor with aluminum grading foils placed at set radii and lengths.

  2. 02

    Fuse

    Heat and pressure bond the film layers into one solid, gap-free core. No liquid resin, no vacuum chamber.

  3. 03

    Finish

    The core is machined and assembled with the flange, terminals and outer housing, then routine tested.

Compared to today's bushings

Dry like resin bushings, without the resin process.

TypeCore insulationProcessOil in bushing
OIPOil-impregnated paperDry paper, vacuum fill with oilYes
RIP / RISResin-impregnated paper or fabricVacuum impregnation, multi-day cureNo
MantleFused polymer filmWind and fuse, no impregnation or cureNo

Where we are

Materials first, then a 69 kV prototype.

  • Now

    Fused-film samplesDeveloping first coupons with Ambion, a US insulation materials manufacturer since 1972, with input from polymer dielectrics researchers.

  • Next

    High-voltage lab testingDielectric loss versus temperature, breakdown strength and partial discharge on test coupons.

  • Then

    69 kV prototypeA full bushing built to IEEE C57.19.01 and taken through design tests.

We're raising a pre-seed round to fund samples, high-voltage testing and a first prototype. If you invest in hardware or energy, or you buy bushings for a utility or transformer factory, we'd like to talk.

Team

Built by a power systems engineer.

Mantle was founded by a licensed professional engineer in power systems with hands-on transformer industry experience, and is supported by Ambion as materials partner and academic advisors in polymer dielectrics. Building at Founders Inc in San Francisco. Founder details are shared directly with investors and partners.

Contact

Let's talk.

Investors, utilities and transformer makers: write to hello@mantlegrid.com for the deck and an intro.